Construction Scheduler, NA

Related keywords: remote job coloradoremote job no degreepart time remote job no experience

Overview of the Employer

Vantage Data Centers is a leading organization that powers, cools, protects, and connects technology for some of the world’s most well-known hyperscalers, cloud providers, and large enterprises. Operating across North America, EMEA, and Asia Pacific, Vantage focuses on innovative data center designs that boost reliability, efficiency, and sustainability in a scalable environment.

Company Culture

Vantage Data Centers cultivates a unique culture by empowering its technical staff to make significant decisions that impact project delivery. Unlike many companies where roles like Construction Scheduler focus solely on oversight, Vantage allows its team members to align operational goals with cost metrics effectively. The company values a supportive environment characterized by no ego and no arrogance, promoting teamwork and mutual respect.

Position Overview

The Construction Scheduler position is remote-based in the United States. The chosen candidate will be part of the Project Controls team and play a key role in driving overall project schedules at a programmatic level across the entire company portfolio. This is a pivotal role where the individual will be responsible for creating and analyzing schedules throughout all stages of the project lifecycle. The position aims to expedite project durations by re-sequencing work as necessary.

Essential Job Functions

The Construction Scheduler will undertake a variety of responsibilities, which include:

  • Developing scheduling policies and procedures and facilitating user training for both internal and external stakeholders.
  • Preparing both conceptual and detailed schedules.
  • Defining activities and associated scopes, durations, logic, and resource loading.
  • Creating, reviewing, and analyzing critical path schedules independently and efficiently.
  • Monitoring schedule performance and conducting complex data analysis.
  • Reporting on schedule variants and working with peers for continuous improvement of business processes.

To effectively execute these duties, the Construction Scheduler must communicate clearly through various means, including verbal discussions, written reports, and graphical representations.

Required Skills and Qualifications

To qualify for this position, candidates should meet the following requirements:

  • A Bachelor’s Degree in Construction Management, Engineering, Quantity Estimating, or a related field, or an equivalent combination of education and experience.
  • A minimum of 3-5 years of relevant work experience, with strong preference for candidates having experience in Data Centers.
  • Proficiency in Primavera Scheduling Software (P6), with knowledge of the latest version being a must.
  • Moderate experience with tools like Procore and Power BI is strongly preferred.
  • Familiarity with Microsoft Office tools such as Excel, PowerPoint, SharePoint, and Word.
  • Ability to travel up to 25% as required by business needs.
  • Knowledge of the Critical Path Method of scheduling and understanding construction documents (drawings, specifications, contracts, etc.).

Salary and Benefits

The offered salary range for this role is between $105,000 and $115,000, base salary plus bonuses. It's important to note that this range is based on data from Colorado and may vary depending on other locations.


In addition to competitive pay, candidates can expect a comprehensive benefits package that includes:

  • Medical, Dental, and Vision coverage.
  • Life insurance and Short and Long-Term Disability coverage.
  • Paid Time Off (PTO) and employee assistance programs.
  • Participation in a 401k program with company matching.
  • Additional voluntary benefits, offering the potential for wellbeing and development in a team-oriented environment.

Working Environment

In terms of physical demands, candidates must be able to manage various physical tasks such as standing, walking, using hands to handle or feel objects, and occasionally lifting or moving items up to 25 pounds. Vantage Data Centers acknowledges the need to accommodate individuals with disabilities to ensure they can successfully perform required functions.

Application Encouragement

Vantage encourages individuals who may not meet all the specific requirements to apply if they resonate with the company's mission and values. The organization is looking for talent that contributes meaningfully to its diverse culture and goals.

Conclusion

Overall, this role presents a fantastic opportunity for candidates who are motivated and have the requisite skills to join a thriving organization. By integrating innovative scheduling techniques, you will not only contribute to Vantage's growth but also enjoy a supportive work environment that values collaboration and respect for individual strengths. Apply as soon as possible to secure consideration for this exciting role and be part of a company that rewards efficient and dedicated work.



This job offer was originally published on himalayas.app

Vantage Data Centers

United States

Operations

Full-time

October 13, 2025

13 views

0 clicks on Apply Now


Similar job offers


This job offer summary has been generated using automated technology. While we strive for accuracy, it may not always fully capture the nuances and details of the original job posting. We recommend reviewing the complete job listing before making any decisions or applications.